Meeting Notes for 11 Feb
Present: Bob, TomJ, Liz, Ken, Sudha, Edit
  Cosmic 
 
-  Blessing:  
-  Tom J will complete the process of reviewing the files that are left.
  -  Edit will update the database, move the OK files and prepare reports for Bob to follow up with the owners of the data.
  -  For step 2 we need to decide whether we will re-bless the files. Tom J will forward the proposal again so we can discuss options next week.
 
 
  -  Cpldfrequencies and shower analysis:  
-  Bob has checked the uploads during Muon week and it seems that the cpldfrequencies are OK.
  -  We need to come back to working with the code fix after we finish blessing.
 
 
  -  Talked briefly about the RaspberryPis.  
-  Need to set up the new ones at Quarknet as soon as we have all the connectors.
 
 
  -  Plot.ly:  
-  Tom J sent Edit links to do some research on this tools for dynamic plots and graphs.
 
 
 
 
  CMS 
 
-  Glossary update:  
-  We will work with this as soon as the Masterclasses are over (May).
 
 
 
 
  General 
 
-  i2u2 hardware:  
-  Systems at Argonne are working with the machines setup.
 
 
  -  Documentation:  
-  We will start uploading documentation to the Wiki. Currently working with the replacement of the blessfiles process.
 
 
 
 
-- Main.EditPeronja - 2015-02-12