Meeting Notes for 10 Jun 2009 
Present: Liz, Phong, Marge, Eric, TomL
Absent: TomJ, Bob, Mihael
  Common 
 
-  What is required before the first-year-test: 
-  The e-Lab that's been through the peer review and corrected (mostly done) 
  -  Workshop version w/ the goals (in progress?) 
  -  Teachers have to use this and the experience from the workshop
 
 
  -  Rollout process 
-  Push to 
www13 for development tests
  -  Push to 
www12 for pre-production push
  -  Push to 
www18 for production 
 
 
 
 
 
-  Seamless authentication is working
  -  Name of the forums? 
  -  By default, hide any threads older than a year old?  
-  Maybe hold off and watch how this works. 
 
 
 
 
 
-  After the push, copy the production database to development. 
  -  Change the forum link IDs. 
 
 
 
-  'Add Activities' page in the Wiki is a prototype to do form-based wiki page inclusion. 
  -  Insert accessor methods for forum association. 
 
 
  Cosmic 
 
-  Check rollover functionality a bit. 
 
 
  LIGO 
 
-  We must get this into production by 1 August for our workshops. 
  -  Peer review probably should be done 
  -  Look-and-feel needs to be consistent over the e-Labs and within LIGO  
-  Teacher pages are mostly done
  -  Student pages need some work
 
 
  -  Look at 
www13 to see LIGO tutorial, etc. updates. 
 
 
  CMS 
  Misc 
-- Main.PhongNguyen - 10 Jun 2009