Meeting Notes for 25 February 2008 
Present: Liz, Marge, Phong, Bob,, TomL 
Absent: Mihael, Eric, TomJ
  Action Items 
 
-  Phong will send out an email to find a good time to do a load test. 
 
 
  Workshops 
 
-  Bob is working on the workshop goals 
 
 
  Execution Controls  
 
-  TomL did execution control testing
  -  Grid execution estimates failed (but Teraport was down) 
  -  Ready for prime-time? 
-  Sometimes the estimates are off badly
  -  Bob thinks they're useful 
  -  TomL wants a bit more time to test them. 
 
 
 
 
  Load Test - Delayed  
 
-  Use SWIFT-Local
  -  Need hard numbers
  -  Mihael needed? 
  -  Do some before/after hard numbers
  -  We need to use files that have never been thresholded (very old, very recent).  
-  At the moment, SWIFT always thresholds on analyses. 
 
 
  -  Bob suggests that each person takes an aspect 
-  Flux
  -  Lifetime
  -  Shower
  -  Upload
 
 
  -  TomJ would be welcome for testing as well. 
 
 
  NSF Metrics 
 
-  Numbers 
-  Files upload
  -  Plots saved
  -  Posters generated
 
 
 
 
  Data Blessing 
 
-  TomJ and Bob are going to Seattle to discuss an automated blessing approach and get the criteria 
  -  Let students decide blessed/not-blessed, but after some time period, do an automated blessing
  -  Possible "purgatory" for data
  -  A low-level basic blessing approach has been generated, a high-level detailed approach has been proposed
 
 
  Workshops 
 
-  Users are not reading anything  
 
 
  Peer Review 
  
 TomL 
 
-  Dale and TomL have met and revised the rubrics and LOs  
-  Also wrote some questions for the content LOs
  -  Pre/post-test development in progress. 
 
 
  -  Went through the CMS test-beam stuff
 
 
  Mihael 
 
-  SSL fix is in 
TRUNK but Mihael does not want to deploy to production due to testing 
  -  Thresholding has to be done all the time for SWIFT - blocker? 
  -  He may be able to get in the upload issue in not too much time 
 
 
-- Main.PhongNguyen - 25 Feb 2009