Meeting Notes for 30 September 2009 
Present: Liz, Phong, TomL, DanK
Absent: Eric, Marge, Bob, TomJ, Mihael
  General 
 
-  We have two different wikis (Teacher-specific, ELabs-Library); at some point we should probably merge the wikis. 
-  Top-level wiki on www13is presently broken - Phong is investigating.
  CMS 
 
-  Ideally get as much done by 24 October
-  TomL would prefer some gradients in the buttons to show the old student contributions 
-  Lots of content probably to be migrated into the wiki and transcluded into our system.  
-  Remember that content on www13is development-only
-  Wiki on www13needs to have page notifications enabled so that authorized persons can migrate data to the production wiki onwww18
 
-  Whole bunch of stuff on the spreadsheet to be completed by the time of the due date
-  Distinguish between the Test Beam and Monte Carlo/Run data 
-  /elab/cms/: Monte-Carlo and Run Data
-  /elab/cms-tb/: Test Beam
-  This will require updating the deployment scripts
 
  OGRE 
 
-  Window pinning is in progress (and some misc other changes) 
-  Once all those issues are done DanK will check it into the ELabs SVN. 
  Fireworks 
 
-  Nifty visualization tool - but it's an interactive X11 application
-  Maybe at some point remotely run it to generate images for our system. 
-  Quite down the road 
-- Main.PhongNguyen - 30 Sep 2009