Meeting Notes for 26 Nov
Present: Bob, TomJ, Liz, Edit
Cosmic
- Blessing:
- Edit will move 14020 files (that were recreated and pass all tests) to production during the weekend.
- Need to continue working with the remaining files that were/were not recreated and decide whether to move them or not.
- We discuss the steps after replacing the physical files:
- We will probably run the autobless routine on the same files before the benchmark code rollout.
- We may also dry-run the blessing java code on all the files to get a report with similarities and differences.
- Once we get these reports we will be able to decide what to do next regarding the blessed status of these files.
-- Main.EditPeronja - 2014-12-03