Meeting Notes for 10 Sept
Present: Bob, TomJ, Ken, Edit
General
- Logbook:
- Bob will send a broadcast and update the newsbox about the update.
- Edit will roll out new code to production on Friday.
- ELabs hardware replacement:
- Systems (Adam) will come up with a plan for the migration. Edit will follow up with them.
- References, glossary and FAQs:
- Edit will check with Liz about rolling out what has been updated already.
Cosmic
- Blessing:
- Tom and Bob will talk about code changes in 13 and decide on what to do next.
- EQUIP:
- Bob and Edit will go over how to improve the user interface based on the feedback from workshops.
- Analysis queue:
- This code will be on hold for the time being.
- Cosmic data upload:
- Edit will resend instructions on how to test this code at www13.
- Dynamic plots:
- We will all have a look at this test version through Google Hangouts next week. Edit will demo how this new code works.
- Raspberry pi and EQUIP:
- We will keep exploring the option of using the RPi for data collection.
-- Main.EditPeronja - 2014-09-10